Before you send
Who sees it: us, then at most three providers or one colocation broker that fit. Who pays: never you. Providers or brokers may pay us a referral fee once agreements exist; as of November 26, 2026 there are none. Exclusions: name any company you don't want contacted, such as your incumbent, in the details box and we won't send it there. Full terms: referral disclosure and privacy policy.
What to include so providers can quote
Capacity, location and dates matter most. A request with kW or MW, the site or target metro and a start date can be priced; one without them usually gets a call first. Each guide explains the scope questions in detail.
| Service | Include if you know it |
|---|---|
| Data center colocation services | Target metro(s), total kW or number of racks, kW per rack, cabinet / cage / private suite, carriers or cloud on-ramps you need, start date and contract term |
| Data center liquid cooling | Number of racks and kW per rack, server or GPU platform, approach under consideration (direct-to-chip, rear door, immersion), facility water available, retrofit or new build, target date |
| Data center cooling companies | Cooling equipment or project (CRAH/CRAC, chillers, CDUs, rear doors, immersion), IT load in kW or MW, new build or retrofit, location, schedule |
| Data center water treatment | Cooling towers, evaporative units or closed loops, tons or flow (gpm), makeup water source, current program or problems (scale, corrosion, Legionella), water-use goals |
| Data center cleaning services | White space square footage, raised floor or slab, live site or post-construction clean, number of halls, how often, access and escort rules |
| Data center maintenance services | Systems to cover (UPS, batteries, generators, switchgear, CRAH/chillers, fire suppression), IT load in MW, number of sites, current contracts and when they end |
| Data center commissioning | New build or expansion, IT load in MW, commissioning levels needed (1 to 5), design stage, construction schedule, whether you are the owner, developer or contractor |
Estimates are fine. Say so, and say what is fixed (a lease end date, a utility energization date, a contract term).
What happens after you send it
- A person reads it. We check that it's a genuine business request with enough detail to act on. If something important is missing, we email you before sending it anywhere.
- We look for a fit. Providers whose own websites show they do this work in your market and at your scale. For colocation, that may be up to three operators with capacity in the metro, or one broker who compares operators for you.
- We tell you where it went. We email you the name of each company that received your request. If nothing fits, we email you to say so.
- They contact you. Providers may ask for drawings, an equipment list or a site walk before they price. Response times depend on them; we can't promise when, or whether, one replies.
The full process, including what a broker does with a colocation request, is on how it works.
When not to use this form
This form is reviewed by hand, so it suits planned work. For an outage, a cooling failure or a leak in progress, call your existing service provider or your facility's emergency contact. For a fire, injury or other life-safety emergency, call 911.