Colocation · Buyer’s guide

Data center colocation services: what’s included, what it costs and how to get quotes

Data center colocation means renting secure space, backed-up power, cooling and network access in another company’s facility for servers you own. You pay mainly for committed power: across eight primary North American markets, CBRE’s average asking rate in the first half of 2026 was $204.69 per kW per month for 250 to 500 kW and $165.31 for 10 MW and up.1 Electricity is usually billed on top,12 and retail deployments of 250 kW or less pay the highest rate per kW.2 Cross-connects, remote hands and setup fees come on top of that. Estimate your bill below, then send one request and we’ll route it to up to three providers or a colocation broker. We’re a referral service, not a colocation provider.

Updated · How we research

What data center colocation services include

A colocation provider supplies the building, the power and cooling plant, physical security, access to networks and on-site staff; you supply and own the servers, storage and network equipment that go in it. CoreSite describes a colocation data center as a facility that offers space with the power, cooling, network access and security to host businesses’ hardware, in anything from cabinets to cages to private suites.5 The table shows where the line usually falls and what to pin down in writing.

What a colocation contract covers, by part of the service. The split varies by provider and contract size; confirm it in the order form.
PartThe provider suppliesYou supply or buy separatelyGet in writing
SpaceCabinet, cage, private suite or hall in a secured buildingServers, storage and network equipmentCabinet size and depth, floor loading, expansion space held for you
PowerUtility service, UPS, generators and distribution to your circuitsKeeping your load inside the committed kW and circuit limitsCommitted kW, circuit count and type, A/B feeds, redundancy level
CoolingMechanical plant and air (or liquid) delivery to the hallEquipment that fits the supported densitySupported kW per cabinet, liquid cooling availability, environmental SLA and where it’s measured
ConnectivityMeet-me room, building entrances, cross-connect cablingThe carrier, internet and cloud services themselvesCarrier and exchange list, cross-connect prices, diverse entrances
Remote handsOn-site technicians for physical tasksConfiguration and anything outside the service menuHourly rate, billing increment, response targets, what’s free
SecurityPerimeter, access control, video, visitor processYour authorized-user list and access policyAccess log availability, escort rules, cabinet and cage locks
ComplianceIndependent audit reports on the facility’s controlsControls on your own systemsReport type, period covered, facilities in scope

Looking for provider names?

This page explains the service and the price. To see who operates where, compare US colocation providers by business model and market in our directory. Listings there are editorial and unpaid.

Space: cabinet, cage, private suite, wholesale hall or powered shell

Pick the space type by how much power you need and how much control you want over the room. Smaller deployments rent cabinets in a shared hall; larger ones rent a caged area, a walled suite or a whole hall.

Colocation space options, smallest to largest. Sources: CoreSite (cabinets, cages, suites), datacenterHawk (halls, powered shells).
SpaceWhat it isUsual size band
Cabinet (rack)A lockable cabinet, or part of one, in a shared hall. CoreSite describes retail colocation as leasing a single rack or area in a shared space.5Retail
CageA fenced, access-controlled area holding several cabinets. CoreSite’s cages range from 100 to 5,000 square feet.5Retail to small wholesale
Private suiteA walled room for one customer. CoreSite calls its private suites its wholesale colocation option.5Wholesale
Wholesale or turnkey hallA finished data hall leased per kW on a modified gross lease, with electricity billed on top.2Wholesale to hyperscale
Powered shellA secure building with power to the site and connectivity, but without UPS, generators or cooling; the tenant installs those, and leases are often priced per square foot rather than per kW.6Hyperscale

If you take a private suite or powered shell and fit it out yourself, you also take on testing and upkeep of that equipment. See data center commissioning for integrated systems testing and maintenance programs for what running the plant involves.

Power: committed kW, circuits and redundancy

Your power commitment, not your floor space, sets most of the price: wholesale colocation is quoted per kW per month.2 In retail, the commitment usually shows up as a set of circuits and a power allowance per cabinet, so check what each circuit can actually carry. In North America, circuits are loaded to 80% of their rating, so a 30 A circuit should carry no more than 24 A.7

What common cabinet circuits deliver, in kVA. Single-phase = volts × amps; three-phase = volts × amps × 1.732. Usable figures apply the North American 80% loading rule (Raritan).7
CircuitAt full ratingUsable at 80%
208 V single-phase, 20 A4.2 kVA3.3 kVA
208 V single-phase, 30 A6.2 kVA5.0 kVA
208 V three-phase, 30 A10.8 kVA8.6 kVA
208 V three-phase, 60 A21.6 kVA17.3 kVA
415 V three-phase, 30 A21.6 kVA17.3 kVA
415 V three-phase, 60 A43.1 kVA34.5 kVA

kW equals kVA multiplied by your equipment’s power factor. Check your hardware specs before converting.

On redundant A and B feeds, the circuit rating is not your allowance. Keep the cabinet’s total load at or below what one feed can carry, so either side can take the full load if the other fails. Voxility’s price list for a full cabinet at Equinix MI1 in Miami shows how this works in practice: the cabinet gets two 30 A, 208 V lines, but the allowance starts at 3 kVA and tops out at 6 kVA, partly because of the risk of losing redundancy if the load moves to a single line.8

Redundancy describes how much spare plant stands behind those feeds. N is the minimum capacity needed at full IT load, N+1 adds one spare component, and 2N duplicates the whole system on two independent distribution paths; a facility can run 2N UPS with N+1 cooling.9 Uptime Institute’s Tier III means concurrently maintainable (any component can be shut down without affecting IT), and Tier IV adds fault tolerance; Uptime says it is the only licensed firm that can certify Tiers.10 If a provider says “Tier III,” ask whether that’s an Uptime certification, and of what (design, constructed facility or operations), or just a design description, and check Uptime’s certification list.

Power redundancy: N, N+1 and 2N Three rows. N has exactly the four UPS units the load needs. N+1 has the same four plus one spare unit. 2N has two complete, separate sets of four units, side A and side B, each able to carry the whole load. N Exactly what the load needs N+1 spare One spare covers one failure 2N A B Two complete, separate systems
Using CoreSite’s example of a load that needs four UPS units: N is four, N+1 is five and 2N is eight, on two independent distribution paths.9 The same logic applies to generators and cooling units, and a facility can mix models.

Metered vs flat (all-in) power

Ask which of two models the quote uses, because they put the electricity risk on different sides. Under an all-in or allowance model, a cabinet price includes power up to a cap and overage is charged: Voxility’s Equinix MI1 cabinet includes 3 kVA and charges $158 for each extra 0.1 kVA of draw.8 Under the modified gross model common in wholesale, you pay a base rate per kW plus electricity as a pass-through, so you pay for what you use.2 Either way, ask where energy is metered, what price per kWh applies, and whether metered IT energy is multiplied by a PUE or loss factor before billing. Also ask about minimums: CBRE reports that take-or-pay floors of 60% to 85% of allocated power are becoming common in US contracts.1

Cooling and density limits

Confirm the supported kW per cabinet before you compare prices, because a facility that can’t cool your density isn’t a real option. CBRE notes that CPU servers once needed 3 to 10 kW per rack for air cooling, while 100 kW GPU servers can only be cooled by a closed-loop liquid system, so air-cooled halls often end up with power concentrated in a few dense racks and floor space left unused.1 datacenterHawk says modern facilities are being designed to move from today’s 30 to 50 kW per rack toward possible 100+ kW requirements.2 Timing matters too: CBRE says ready-for-service dates for density upgrades have stretched from weeks to months, and conversions of air-cooled space to liquid cooling can take more than six months.1 For direct-to-chip, rear-door and immersion options, see our liquid cooling guide.

Connectivity: carriers, internet exchanges, cloud on-ramps and cross-connects

Connectivity is bought as separate pieces: the facility gives you access, and each physical link is a cross-connect with its own fee. A meet-me room (MMR) is the space where carriers and network providers interconnect with customers; facilities with many carriers are sometimes called carrier hotels.5 Facilities publish what’s on site: Hurricane Electric’s Fremont 2 page, for example, lists 13 internet exchange points, 295 networks and 8 carriers with diverse fiber.11

  • Cross-connects. A cable from your cabinet to another party in the building. Equinix charges a one-time installation fee and a monthly fee for standard cross-connects, plus a deinstallation fee if you end the term early.12
  • Cloud on-ramps. For AWS Direct Connect, you download an LOA-CFA and the facility completes the cross-connect; the LOA-CFA expires if the cross-connect isn’t completed within 90 days, and AWS says cross-connect pricing comes from the facility partner.14
  • Carriers and internet exchanges. Ask for the current on-net carrier list and which exchanges are reachable in the building, and whether there are diverse building entrances.
How a colocation deployment connects to networks and clouds Your cabinet or cage connects by a cross-connect cable to the meet-me room. From the meet-me room, further cross-connects reach carriers and transit providers, an internet exchange, and a cloud on-ramp such as an AWS Direct Connect router. Your cabinet or cage Cross-connect setup + monthly fee Meet-me room (MMR) Carriers and transit Internet exchange Cloud on-ramp Each link is its own line item
The path from your equipment to carriers, internet exchanges and cloud on-ramps. Equinix, for example, charges an installation fee and a monthly fee for a standard cross-connect.12 For AWS Direct Connect, you download a Letter of Authorization and Connecting Facility Assignment (LOA-CFA) and the facility completes the cross-connect.14

Remote hands

Remote hands are on-site technicians who do physical work for you, billed by the hour unless your contract bundles them. STACK’s published service list includes rack and stack, cabling, escorted access, equipment power cycling, inspections and cross-connect cabling, with shipping and receiving at no charge.15 Two published rate cards show the spread: Tier.Net charges $125 an hour in business hours, and STACK charges $250 an hour in business hours and $375 off hours.1615 The billing increment matters as much as the rate: STACK bills in 15-minute increments, and Tier.Net bills some after-hours work in one-hour blocks.1516

Physical security

Ask how a person gets from the street to your cabinet, and what record that leaves. CoreSite lists perimeter fencing, video monitoring and biometric access; Hurricane Electric lists individually locked cabinets, video surveillance of every cabinet and card-keyed doors.511 Ask for access log extracts on request, the visitor and escort policy, how deliveries are received and held, and who can authorize new users on your account.

Compliance reports: SOC 2, ISO 27001, PCI DSS and HIPAA

A provider’s audit reports cover its controls, not yours, so check what each document actually covers before you rely on it.

Compliance documents colocation buyers ask for, what they show and what to check.
DocumentWhat it isWhat to check
SOC 2 reportA CPA’s report on a service organization’s controls relevant to security, availability, processing integrity, confidentiality or privacy. Type 1 and Type 2 reports exist.17Ask for the latest Type 2. Check which categories, which facilities and which dates it covers. In 2026 the AICPA issued peer-review alerts about risks it observed in SOC 2 engagements, so the auditor’s name matters too.17
ISO/IEC 27001:2022 certificateCertification of an information security management system against the standard; ISO says a certificate from an accredited certification body may add confidence.18Check the edition (2022), the certification body and whether your facility is inside the certificate’s scope.
PCI DSS Attestation of Compliance and responsibility matrixPCI DSS requires the assessed entity to maintain information on which requirements each third-party service provider manages; the PCI SSC suggests a responsibility matrix.19Ask which requirements the provider covers (typically physical security of the facility) and which stay with you.
HIPAAThere is no HIPAA certification that replaces a contract: HHS says a business associate can’t self-certify or be certified by a third party instead of signing a written agreement.20Have your counsel decide whether the provider is a business associate, and if so, whether it will sign a business associate agreement (BAA).

Retail vs wholesale vs hyperscale colocation

The three models differ mainly in size, contract length and price per kW: the bigger the commitment, the lower the rate and the longer the term. datacenterHawk segments the market as follows.2

Colocation deployment models. Size bands and terms: datacenterHawk (2026). Rates: CBRE H1 2026 averages, primary North American markets, $ per kW per month; CBRE’s size tiers don’t line up exactly with datacenterHawk’s bands.
RetailWholesaleHyperscale
SizeUp to 250 kW250 kW to 4 MW4 MW and up
Typical term1 to 3 years, more flexibility3 to 7 years10 to 15 years, with pre-negotiated expansion rights
SpaceCabinets and cagesCages, private suites, hallsHalls, buildings, powered shells
Price per kWHighest per unit2; CBRE publishes no retail average$204.69 (250 to 500 kW), $183.75 (500 kW to 3 MW), $175.00 (3 to 10 MW)1$165.31 (10 MW and up)1
Who buysSmaller enterprise deployments2Enterprises; JLL puts individual enterprise requirements at 500 kW to 3 MW4Mainly hyperscalers; JLL puts 2026 tenant demand at 59% hyperscalers, 11% neoclouds and 7% AI companies4

Enterprise buyers in the middle are being squeezed: JLL says even 500 kW to 3 MW requirements are struggling to secure capacity amid competition from hyperscale deployments.4 If you need wholesale-sized capacity in a primary market, start early and ask several providers at once.

How colocation pricing works in 2026

A colocation bill has five parts: a base rate per committed kW per month, electricity, cross-connects, remote hands and other services, and one-time setup fees, all shaped by the escalator and term. The base rate is the biggest line for most deployments, and it has been rising: JLL says data center rents are up nearly 70% since 2020, averaging 9% a year.4

Asking rates by requirement size

Larger requirements pay less per kW, but every size tier rose in H1 2026, and 3 to 10 MW rose fastest, by 8.3%.1

Average asking rental rates by requirement size, eight primary North American markets, $ per kW per month. Source: CBRE North America Data Center Trends H1 2026, Figure 3. Asking rates, not signed deal prices.
Requirement size202120232025H1 2026Change in H1 2026
250 to 500 kW$120.36$163.44$196.25$204.69+4.3%
500 kW to 3 MW$105.63$140.00$170.31$183.75+7.9%
3 to 10 MW$93.21$127.81$161.56$175.00+8.3%
10 MW and upNot charted$117.19$155.00$165.31+6.7%

The primary markets are Northern Virginia, Atlanta, Dallas-Ft. Worth, Phoenix, Chicago, Silicon Valley, Hillsboro and New York Tri-State. CBRE’s tiers start at 250 kW.1

Asking rates by market

Location moves the rate by tens of dollars per kW. Silicon Valley had the widest and highest range of the primary markets in H1 2026, and Dallas-Ft. Worth the lowest.1

Wholesale market fundamentals, H1 2026. Asking rates are $ per kW per month for 250+ kW at N+1/Tier III requirements. Source: CBRE North America Data Center Trends H1 2026, Figures 1 and 2.
MarketInventory (MW)VacancyAsking rate
Primary markets
Northern Virginia4,496.50.2%$190 to $235
Atlanta1,803.21.6%$185 to $200
Dallas-Ft. Worth1,432.82.8%$160 to $185
Phoenix1,069.21.1%$175 to $215
Chicago910.62.2%$195 to $225
Silicon Valley509.24.2%$200 to $275
Hillsboro, OR491.40.2%$185 to $225
New York Tri-State190.07.2%$190 to $235
Secondary markets
Central Washington409.02.9%$155 to $175
Austin-San Antonio243.11.4%$160 to $185
Houston207.35.0%$165 to $195
Southern California200.212.6%$175 to $250
Seattle156.35.4%$155 to $175
Denver130.113.8%$155 to $175
Minneapolis87.816.8%$165 to $175
Charlotte-Raleigh58.213.4%$190 to $235

Published prices for cross-connects, remote hands and retail cabinets

Few operators publish retail prices, so the table lists what we could verify on providers’ own pages. Treat these as examples from single facilities, not market averages.

Published colocation fee examples from the sellers’ own pages, US facilities, checked November 27, 2026. Single-facility list prices in US dollars, excluding taxes; not market averages.
ChargePublished byPrice
Full cabinet with 3 kVA allowanceVoxility, selling space in Equinix MI1, Miami$2,036 a month on a 1-year commitment; 4 kVA adds $603 a month8
Power over the allowanceVoxility, Equinix MI1$158 per extra 0.1 kVA8
Single-mode fiber cross-connectVoxility, Equinix DC3, Ashburn$1,000 setup plus $375 a month, month-to-month13
Cross-connect termsEquinixInstallation fee plus monthly fee; deinstallation fee to end a term early; no prices published12
Remote handsSTACK Infrastructure$250 an hour, 8 am to 6 pm local; $375 off hours; 15-minute increments15
Remote handsTier.Net$125 an hour in business hours; $160 to $250 after hours, by location; rack and stack and power cycling free in business hours16

What changed in colocation contracts in 2026

Supply is tight, and contract terms have moved toward the provider. Check each of these in any 2026 quote:

  • Near-zero vacancy. CBRE puts primary-market vacancy at a record-low 1.4%, with 80.4% of capacity under construction already preleased.1 JLL says most tenants signing today are contracting for 2028 deliveries.3
  • Take-or-pay floors. Minimum power utilization floors of 60% to 85% of allocated power are becoming common.1
  • Triple-net (NNN) structures. Some operators are moving from modified gross plus electricity to NNN, where occupiers pay taxes, common area maintenance and insurance directly.1
  • Longer ready-for-service dates. Equipment constraints now delay fit-outs in existing facilities, not just new ones.1
  • Electricity taxes and tariffs. Virginia’s $0.011/kWh consumption tax took effect on July 1, 2026, and several other states have approved or enacted large-load tariff frameworks.1 Ask how any new tax or tariff is passed through.

Estimate your monthly colocation cost

Enter your cabinets and committed kW per cabinet to estimate the monthly bill and the total contract value. The price defaults come from published sources listed below the estimator, and the deployment defaults (40 cabinets, 10 kW each, 60% draw) are an example; replace each one with your own figures and quotes as they come in.

Colocation monthly cost and contract value estimator

Estimator

Monthly recurring, year 1

$108,527

All-in per committed kW

$271.32

Total over 5 years

$6,826,747

One-time fees

$4,000

Monthly cost breakdown, year 1
Deployment400 kW committed
Base rate used$204.69 per kW per month
CBRE H1 2026 average, 250 to 500 kW
Space and power capacity (rent)$81,876
Electricity$24,651
Cross-connects$1,500
Remote hands$500
Monthly recurring in the final year$119,054

How it works: committed kW = cabinets × kW per cabinet. Rent = committed kW × base rate. Electricity = committed kW × average draw × 730 hours × energy multiplier × price per kWh. Cross-connects and remote hands are count × price. Leave the energy multiplier at 1.0 if you’re billed on metered IT energy alone; enter your contract’s PUE or loss factor if it applies one. The escalator is applied each year to rent, cross-connects and remote hands; electricity is held at today’s price because it is usually passed through at cost. Total = all monthly charges over the term + one-time fees. The base rate is CBRE’s H1 2026 average asking rate for your size tier across eight primary markets (tiers start at 250 kW) unless you pick a market (midpoint of CBRE’s range for 250+ kW at N+1/Tier III) or enter your quote. These are planning estimates, not quotes; taxes, cage build-out, equipment and network services are not included.

Worked example (the defaults): 40 cabinets at 10 kW is 400 kW, which uses CBRE’s 250 to 500 kW average of $204.69. Rent is $81,876 a month. Electricity at 60% average draw, 730 hours and 14.07 cents per kWh is $24,651. Four cross-connects at $375 add $1,500 and two hours of remote hands at $250 add $500, for about $108,527 a month, or $271.32 per committed kW. Over five years with a 3% escalator and $4,000 of cross-connect setup fees, the contract comes to about $6.83 million.

Where the defaults come from:

  • Base rate: CBRE H1 2026 averages by size, or the midpoint of the market range you pick.1 Under 250 kW the estimator still uses the 250 to 500 kW average and flags it, because retail rates run higher.
  • Average draw, 60%: the low end of the take-or-pay floors CBRE reports, so it’s roughly the least you’d pay for under such a clause.1
  • Electricity, 14.07 cents per kWh: the EIA’s US average commercial price for January to September 2026 (preliminary). The industrial average was 9.14 cents. Use your provider’s pass-through rate when you have it.21
  • Cross-connect $375 a month and $1,000 setup: the published single-mode fiber price at Equinix DC3, Ashburn, through Voxility.13
  • Remote hands $250 an hour: STACK’s published business-hours rate.15
  • Escalator 3% and term 5 years: inside datacenterHawk’s typical ranges of 2.5% to 5% and 3 to 7 years for wholesale.2

Colocation RFP checklist: what to specify and what to ask

Send every provider the same requirements and ask them to answer the same questions in the same format, so you can compare quotes line by line.

Requirements to send

  • Target metros, and how far from your offices or users the site can be.
  • Committed kW on day one, the ramp schedule, and the kW you expect at 24 and 36 months.
  • Number of cabinets, kW per cabinet, and the densest cabinet you plan to run.
  • Cooling: air only, or liquid (direct-to-chip, rear-door) with the facility water you need.
  • Space type: cabinets, cage, private suite or hall, and any expansion space to hold.
  • Power design: A/B feeds, circuit types, and the redundancy level you need (N+1, 2N).
  • Carriers, internet exchanges and cloud on-ramps you need, and how many cross-connects.
  • Expected remote hands hours and any after-hours work.
  • Compliance documents you need (SOC 2 Type 2, ISO/IEC 27001:2022, PCI DSS, BAA).
  • Ready-for-service date, preferred term, and when your current contract ends.

Questions every provider must answer

  • Base rate per kW per month, and whether it’s all-in or plus electricity.
  • How electricity is metered and priced, any PUE or loss factor, and any take-or-pay minimum.
  • Itemized one-time fees: cage build, circuits, cross-connects, installation.
  • Cross-connect setup and monthly prices by type (single-mode, multimode, copper).
  • Remote hands rate card, billing increment and which tasks are free.
  • Supported kW per cabinet today, and the date and cost to support more.
  • Uptime Institute Tier certification held, if any, and the facility’s actual redundancy for UPS, generators and cooling.
  • SLA text, not a summary: what counts as an outage, how credits are calculated and capped.
  • Escalator, renewal terms, expansion rights and exit costs.

Contract terms to negotiate

The base rate gets the attention, but the terms below decide what you actually pay over the contract and how easily you can leave. Negotiate them before you sign, while you still have alternatives.

Colocation contract terms: what to ask for and why.
TermWhat to ask forWhy it matters
SLA definitionsPower availability defined per feed, an outage defined at your circuits, environmental limits measured at the cabinet inlet, and credits stated as a share of the monthly fee, with the cap and the claim deadlineA headline figure means little without its definition. CoreSite, for example, advertises a 100% uptime SLA; read how any provider defines and pays out on it.5
Power commit vs burstThe committed kW, a ramp schedule, the take-or-pay floor, the overage price and the most any one circuit may drawFloors of 60% to 85% are becoming common, and overage can be priced per 0.1 kVA.18
EscalatorsA fixed annual cap, and a list of which charges escalate (rent, cross-connects, remote hands)Escalators typically run 2.5% to 5% a year and compound over the term.2
Electricity pass-throughBilling at cost, the meter location, the rate source, and how new taxes or tariffs pass throughVirginia’s $0.011/kWh consumption tax took effect July 1.1
Delivery dateA ready-for-service date with credits, or a right to terminate if it slips, and a definition of ready for service that includes completed commissioning and integrated systems testing (IST) of your spaceFit-out dates have stretched from weeks to months, and longer for liquid cooling conversions.1
ExpansionRight of first refusal on adjacent space or reserved capacity at a stated priceHyperscale terms often include pre-negotiated expansion rights; ask for the same at your scale.2
RenewalAn option to renew with a capped increase, and a notice window that leaves time to rebiddatacenterHawk describes renewals jumping from $75 per kW to $130 to $150 per kW.2
Lease structureConfirm modified gross plus electricity, or exactly which costs pass through under NNNSome operators are moving to NNN, shifting taxes, maintenance and insurance to occupiers.1
ExitNotice period, removal window, holdover rate, and deinstallation fees for cross-connectsEquinix charges a deinstallation fee to end a cross-connect term early.12
Remote handsThe rate card fixed for the term, the billing increment, and a list of included tasksPublished rates and increments vary widely (see the fee table above).1516
ComplianceA right to receive each year’s SOC 2 and ISO certificate, the PCI responsibility split and, if needed, a BAASOC 2 reports cover a past period and certificates carry expiry dates, so your auditors will ask for current ones.

Colocation vs cloud vs on-premises

Colocation fits when you want to own and run your hardware but not the building; cloud fits when you’d rather not own hardware at all; on-premises fits when you already have a room with the power and cooling you need. In colocation you own the IT assets; in cloud you don’t own the underlying infrastructure.22

Colocation, public cloud and on-premises compared. The last row is our editorial rule of thumb, not a market statistic.
ColocationPublic cloudOn-premises
Owns the hardwareYouThe cloud providerYou
Owns building, power, coolingThe colocation providerThe cloud providerYou
How you payPer committed kW per month plus extras, on a termFor services usedCapital for the room and plant, plus running costs
Lead time for capacityJLL says most tenants signing today are contracting for 2028 deliveries3No facility lead time for youYour own build or retrofit, subject to equipment lead times1
Usually fitsSteady workloads on your own hardware, dense or GPU systems, private links to clouds and carriersVariable or short-lived workloadsExisting rooms with spare power and cooling

The options combine: a colocation cabinet with a cloud on-ramp cross-connect gives you a private link to a cloud provider from your own hardware.14

Find colocation providers by market

To see which operators run facilities in your target market, use our directory of US colocation operators. It groups operators by business model and markets, with each company’s claims linked to its own site. If your deployment needs dense cooling, our cooling companies directory lists the manufacturers and integrators that fit out liquid and air systems.

Limits of this guide

CBRE’s figures are asking rates, not signed deal prices, for requirements of 250 kW and up (CBRE states N+1/Tier III for its market ranges); they don’t cover retail cabinets, and signed rates for your deal can be higher or lower. The published fee examples come from single facilities and sellers, not market surveys. The electricity default is a national average; your utility and provider pass-through rate will differ. The PCI DSS reference comes from a PCI SSC supplement that uses v3.1 numbering; check the current standard with your assessor. We didn’t review the full SOC 2 criteria, ISO/IEC 27001 text or Uptime Tier standards. This is general information, not legal, engineering or financial advice.

Request colocation quotes through Data Center Service Providers

Send one request with your requirements: at minimum the target metro, committed kW, densest cabinet and ready-for-service date, plus anything else from the RFP checklist you already know. A person reviews it and looks for up to three colocation providers that serve your market, or a colocation broker who can run a wider search. If we can’t find a match, we’ll tell you. Providers or the broker contact you directly, and you decide whether to sign anything. It’s free for buyers.

How the money works: providers and brokers may pay us a referral fee if you sign. If we route you to a broker, ask how the broker is paid; ENCOR Advisors, for example, describes its data center advisory as coming at no cost to the tenant.22 Some operators publish referral programs; DC BLOX’s pays a one-time 3% of total contract value when an accepted lead becomes a customer, and it excludes some deals, such as colocation power of 200 kW and above.23 We haven’t joined any referral program and have no agreements with any provider or broker today. Read our referral disclosure and how requests are handled.

Request colocation quotes

Sources

  1. North America Data Center Trends H1 2026, CBRE Research, August 27, 2026. Figure 3 (average asking rates by requirement size, primary markets) and Figures 1 and 2 (market fundamentals; rates are quoted asking rates for 250+ kW at N+1/Tier III requirements). Dollar values read from the report’s chart data labels. Also the source for vacancy, take-or-pay floors, NNN leases, ready-for-service delays, rack density and the Virginia consumption tax. Checked 2026-11-27.
  2. Colocation Data Center Pricing: A 2026 Beginner’s Guide, datacenterHawk, 2026. Retail, wholesale and hyperscale size bands; modified gross lease plus electricity; typical terms; escalators of 2.5% to 5%; renewal pricing example. Checked 2026-11-27.
  3. North America Data Center Report Midyear 2026, JLL, August 11, 2026. Vacancy near 1% for a third year; tenants contracting for 2028 deliveries. Checked 2026-11-27.
  4. Data center demand exceeds expectations as H1 2026 absorption hits record 25 GW, JLL (news release), August 11, 2026. Rents up nearly 70% since 2020, averaging 9% a year; enterprise requirements of 500 kW to 3 MW; demand mix. Checked 2026-11-27.
  5. Colocation Services, CoreSite. Vendor page. Cage sizes, private suites, remote hands, meet-me room and carrier hotel definitions, security features, advertised SLA. Checked 2026-11-27.
  6. Understanding Powered Shell Data Centers, datacenterHawk. Checked 2026-11-27.
  7. Rack PDU Power Rating vs. Load Capacity, Raritan (Legrand), February 18, 2015. Vendor page. North American 80% circuit loading and the 208 V, 30 A single-phase example. Checked 2026-11-27.
  8. Full Rack Cabinet Colocation in Equinix MI1 Miami (price list), Voxility. A company selling cabinet space inside an Equinix building; its own prices, not Equinix list prices. Checked 2026-11-27.
  9. What is Data Center Redundancy? N, N+1, 2N, 2N+1, CoreSite. Vendor page. Checked 2026-11-27.
  10. Tier Classification System, Uptime Institute. Checked 2026-11-27.
  11. Colocation at Hurricane Electric, Hurricane Electric. Vendor page. Facility feature lists for Fremont 1 and Fremont 2. Checked 2026-11-27.
  12. Cross Connects: Pricing and Billing, Equinix Product Documentation. Checked 2026-11-27.
  13. Cross Connect from Equinix DC3 Ashburn (price list), Voxility. Single-mode fiber pair; the seller’s price, not Equinix’s own list price. Checked 2026-11-27.
  14. Requesting cross connects at Direct Connect locations, AWS Direct Connect User Guide. Checked 2026-11-27.
  15. Remote Hands service sheet, STACK Infrastructure, Effective June 1, 2025. Vendor document. Rates, billing increment and service list. Checked 2026-11-27.
  16. Remote Hands Rates, Tier.Net Technologies. Vendor page. Rates by location and free services. Checked 2026-11-27.
  17. System and Organization Controls: SOC Suite of Services, AICPA & CIMA. Checked 2026-11-27.
  18. ISO/IEC 27001:2022, Information security management systems: Requirements, International Organization for Standardization, Published October 2022. Checked 2026-11-27.
  19. Information Supplement: Third-Party Security Assurance, PCI Security Standards Council, March 2016. Requirement numbering in this supplement refers to PCI DSS v3.1. Checked 2026-11-27.
  20. Can business associates self-certify or be certified by a third party as compliant with HIPAA?, U.S. Department of Health and Human Services, Office for Civil Rights, Content last reviewed January 9, 2023. Checked 2026-11-27.
  21. Electric Power Monthly, Table 5.3: Average Price of Electricity to Ultimate Customers, U.S. Energy Information Administration, Released November 24, 2026 (data through September 2026). 2026 values are preliminary. Checked 2026-11-27.
  22. Data Center Colocation Services: The Complete Guide [2026], ENCOR Advisors, Modified June 29, 2026. Tenant advisory firm’s page; cited for how it describes its fees. Checked 2026-11-27.
  23. Referral Program, DC BLOX. Cited only to show how a published referral program works. We have not joined it. Checked 2026-11-27.